Framing Cost Calculator

19 studs @ 16″ OC (plates in orange)

27 studs

19 from spacing math + 8 for corners/openings (labeled convention). Plates: 72 lf = 9 8-ft sticks.

Typical crew rate for this trade: $43-$71/hr (modeled from BLS median wage × published burden/markup band). How we model costs.

Reference material price: 2x4x8 #2 Premium KD-HT Stud, $4.15/each (typical retail, sampled 2026-08-15; local prices vary). How we model costs.

  • Run studs: exact spacing math, ceil(24′ × 12 ÷ 16") + 1. This part is arithmetic, not convention.
  • Adders (+2/corner, +4/opening for kings, jacks, cripples) are an uncited trade convention, labeled as such and not laundered into fact. Complex corners (California vs 3-stud) and wide headers change them.
  • Plates: single bottom + double top = 3× wall length (platform-framing convention). Blocking, fire-stops, and waste are not included, so add them per your plan.
  • A 2×4 is actually 1.5″ × 3.5″ (PS 20 nominal-vs-actual); layout math uses nominal OC.

Want quotes from local pros for this project? We’re gauging demand for a pro-matching service. No contractor network exists yet: this is a get-notified list, not a quote request.

Why This One Is Different

A 20-foot wall at 16-inch on-center spacing needs 16 studs before you've counted a single corner or opening: that part is arithmetic, not pricing. The pricing part is where most calculators go quiet: a framer's charged rate is not simply the number on a wage survey; that survey wage gets run through statutory burden and marked up to hit a margin. This tool keeps that chain visible instead of collapsing it into one dollar figure: it sizes stud and plate quantities the same way any framing takeoff does, prices 2×4×8 material against a sampled SKU, and shows a modeled labor band built from a published wage rather than a flat rate. Full assumptions live at /methodology/.

Where the Numbers Come From

  • The published BLS wage for carpenters is straight-time gross pay only (no overtime, bonuses, or benefits), making it the bottom rung of a burden chain, not a chargeable rate on its own. Source: BLS, OEWS FAQ / methodology
  • Fully burdened labor cost stacks statutory adders (employer FICA 7.65%, FUTA/SUTA) plus workers' comp and benefits onto the base wage, landing near 1.2-1.4× for open-shop crews. Source: IRS Topic 751; BLS Employer Costs for Employee Compensation (see /methodology/)
  • Charged rate is burdened wage times a markup set to hit a target margin; NAHB-measured single-family builder gross margins ran about 20.7% in FY2023: a 50% markup on cost is only a 33% margin on price, not the same number. Source: NAHB, Cost of Doing Business study (2023 ed.) via Eye on Housing
  • Run-stud count is exact spacing arithmetic (ceil(length × 12 ÷ OC) + 1), but corner and opening adders on top of it are an uncited trade convention, labeled as such rather than presented as code. Source: quantity-takeoff framing convention (construction-estimating canon)

More Questions

Why is the labor cost shown as a range instead of one number?

Burden and markup both vary by region, shop type, and company overhead. Collapsing that into a single blended figure would hide exactly the part of a contractor quote that's actually negotiable.