Material Calculator for a Concrete Slab

10 ft10 ft4depth

Order 1.28-1.36 yd³

Plan volume 1.23 yd³ (33.33 ft³); range = NRMCA CIP-8 4-10% ordering allowance.

Reference material price: SAKRETE 60 lb Gray Concrete Mix, $4.68/bag (typical retail, sampled 2026-08-15; local prices vary). How we model costs.

  • Volume is plan geometry; NRMCA CIP 8 says order 4-10% over plan (subgrade, forms, spillage).
  • A 1/8" thickness variation on a 4" slab is a ±3% volume swing; measure thickness honestly.
  • Ready-mix increments and short-load fees are vendor practice; confirm with your plant.

Why This One Is Different

Concrete is the headline material on a slab job, but it's rarely the only line on the shopping list: vapor barrier, wire mesh or rebar, and edge-form lumber all get bought around the same trip. This calculator handles the concrete side precisely: plan volume from your dimensions, an ordering allowance for spillage and subgrade irregularity, and, if you're buying bags instead of ready-mix, a whole-bag count at the published yield for a 60 lb mix (0.45 cubic feet per bag, or about 60 bags per cubic yard). What it won't do is guess at your reinforcement schedule, because that's a structural decision, not a volume calculation.

Where the Numbers Come From

  • Bag count per yard isn't a round number by accident: a 60 lb bag of concrete mix yields approximately 0.45 cubic feet, giving roughly 60 bags per cubic yard, a published, manufacturer-stated 'approximately' figure, not an exact number. Source: QUIKRETE Concrete Mix No. 1101 TDS (rev. 2022)
  • Order more than your raw plan volume, no matter how carefully you measured: NRMCA guidance is to order 4-10% more than plan-derived volume for any formed pour, applied on top of the raw bag count before rounding to whole bags. Source: NRMCA, CIP 8: Discrepancies in Yield (2021 reprint)
  • Rounding follows net volume, then the ordering allowance, then rounds up to the nearest whole purchase unit. Partial bags aren't sold, so the calculator never reports a fractional bag count. Source: construction-estimating engine convention (QUIKRETE TDS 'approximately' basis)

More Questions

Do I need rebar or wire mesh in a slab?

It depends on the slab's use and local code. Driveways and structural slabs commonly require reinforcement, while some light-duty walkways don't. This is a structural decision to confirm with your local building department, not something a volume calculator determines.